Projects
 Client: CGG Veritas/Murphy Oil
  
 Worksite: Biris Field, Sabah
 Workscope: Ocean bottom seismic survey
 Period: June-July 08
  
 Client: Hallin Marine/JVPC
 Worksite: Rang Don Field, Vietnam
 Workscope: Hook-up mooring leg to FSO and riser  installation
 Period: July-Nov 08
  
 Client: TL Offshore/SSB
 Worksite: F13W, F13E, SCDR-A
 Workscope: Pipelay
 Period: Aug-Dec 08
  
 Client: EOCP/Talisman
 Worksite: PM3 Northern Development
 Workscope: Chain lay and mid water arch installation
 Period: Feb 09
  
 Client: TL Offshore/PCSB
 Worksite: Angsi Field-Terengganu, Dana Field-Sarawak
 Workscope: Pipelay
 Period: March-Nov 09
  
 Client: Neptune Marine/TLGH/PCSB
 Worksite: Betty oil field, Miri
 Workscope: Pipe survey - leak detection
 Period: June-July 09
  
 Client: Neptune Marine/Trident Oil
 Worksite: Longtom Field, Bass Straits-Australia
 Workscope: Subsea Inspection and cleaning
 Period: July-Oct 09
  
 Client: EOCP/Star Energy
 Worksite: West Natuna, Indonesia
 Workscope: Riser Installation - survey
 Period: Nov-Dec 09
  
 Client: EOCP/NuCoastal
 Worksite: Bua Ban, Thailand
 Workscope: Jacket Installation
 Period: Jan-Feb 2010
  
 Client: Petrol Vietnam Drilling
 Worksite: Thang Long - Dong Do Field
 Workscope: Jack-up rig inspection
 Period: Apr 2010